Infrastructure
- Crystalline silicon solar cell industrial laboratory was established in 2010 (Figure 1).

Figure 1: Industrial level research laboratory for mono-Si based solar cells
- Industrial laboratory for sol-gel silicon oxide technology was established in 2010.
- PV module assembly plant 65 MW. Started production in May 2011 (Figure 2).

Figure 2: Crystalline Silicone Solar Modules Production Plant
- Full-scale silicon solar cell manufacturing plant: the first production 60MW line will be launched in 2012, and next 60MW line - in 2015 (Figure 3).

Figure 3: Visoriai Valley (under construction; to be launched in 2012)
- PV module assembly plant (60 MW) will be launched in 2012.
- PV R&D centre (an ongoing cluster project administrated by ProTech, 2011-2013)

Figure 4: ProTech's Research Center in Vismaliukai (2012) - PV cluster RTD facilities.
- Silicon feedstock innovative pilot line and silicon wafers (2012-2013)

Figure 5: Vismaliukai R&D Area

Figure 6: Field testing of experimental PV plant